Skip to content

Live On Air

🎧 Listen Live 🔴

  • Home
  • Classic TV
  • Shows
  • The Crew
  • News
  • Events
  • Competitions

Minister of works directs that a 14-day termination notice be issued to CCECC

News

Works Minister, David Umahi, has directed that a 14-day termination notice be issued to Messrs China Civil Engineering Construction Corporation, (CCECC) which is handling the Abia Section of Enugu-Port Harcourt Highway currently undergoing rehabilitation.

Umahi, who gave the directive during an inspection of the work progress at Ozuaku, after the Imo Bridge, revealed that “non-performance” was the reason for termination.

According to Sen. Umahi, the situation where contractors will put blank ranks on site and escalating construction costs by delaying the completion of the project date, will no longer be tolerated.

More Posts

Julian Alvarez Out of Atletico Squad for Liverpool Clash

Julian Alvarez Out of Atletico Squad for Liverpool Clash

Read More »
Presidency Projects Single-Digit Inflation Soon

Presidency Projects Single-Digit Inflation Soon

Read More »
FG Charges Sowore for Cyberbullying Tinubu

FG Charges Sowore for Cyberbullying Tinubu

Read More »
2027 Election: Obasa Says APC Will Decide His Future

2027 Election: Obasa Says APC Will Decide His Future

Read More »
  • 2025 Copyright © Megalectrics Limited
  • Privacy Policy
  • Terms
Facebook-f Instagram Twitter Youtube
Facebook-f Instagram Twitter Youtube
  • Copyright © 2022 Megalectrics Limited
  • Listen Live

Live On Air

  • About Us
  • Shows
  • News
  • Classic TV
  • The Crew
  • Contact Us

Classic 97.3 FM

LAGOS

26 Keffi Street, Off Awolowo Road, Ikoyi, Lagos

  • Port-Harcourt
  • Abuja
  • Privacy Policy
  • Terms
  • 2025 Copyright © Megalectrics Limited
Facebook-f Instagram Twitter Youtube
  • Listen Live

Live On Air

  • Home
  • About Us
  • Classic TV
  • Shows
  • The Crew
  • News
  • Contact Us
Facebook-f Instagram Twitter Youtube
  • Privacy Policy
  • Terms
  • Copyright © 2022 Megalectrics Limited